Challenge
n North Jutland has the highest CO2 emissions per capita, largely due to the Aalborg Portland cement plant, which emits over 2 million metric tons of CO2 annually —more than 10 times as much as the second-largest CO2 emitter in Denmark.
In 2020, the North Jutland cement plant entered into an agreement with the government to reduce its CO2 emissions by at least 660,000 metric tons of CO2 by 2030, and at the same time, the company committed to further reductions to help achieve our shared 70 percent target.
It is important to reduce CO2 emissions, but it is at least as important to find a smart way to capture those emissions, store them efficiently, and put them to good use. CO2 capture will be one of the key elements in ensuring the success of the green transition.
Solution
This project is the first step and a necessary part of the value chain for realizing Aalborg’s vision of becoming an industrial leader in CCUS. The project analyzes and models two different CO2 capture technologies—cryogenic and amine-based CO2 capture—with the aim of developing a basis for decision-making regarding the selection of the most cost-effective CO2 capture technology for Aalborg Portland. This result will subsequently be used in the design of the CO2 capture hub.
Effect
- A basis for decision-making regarding the selection of CO2 capture technology, based on comparative studies of the most relevant technologies.
- Design of the CO2 capture lighthouse project, including expected operational data and economic efficiency, as well as the design of infrastructure with a focus on sector integration around the CO2 capture facility in Portland, Aalborg.
- A study of the feasibility of providing system services from a cryogenic CO2 capture plant and the feasibility of achieving sufficient CO2 purity from this type of plant. This is being done through participation in a DOE-supported demonstration of cryogenic CO₂ capture at a cement plant in Missouri, USA.
Partners
- Aalborg Portland
- Aalborg CSP
- AAU